TOTAL ACCESS SOLUTIONS CORP. (TASC)

Address:
1173 Michener Rd Unit 9
Sarnia
Canada
N7S 4W3
TSSA BPV Certification Number Certificate Type Scope Description Expiry Date
QA-10230

Boilers & Pressure Vessels Repair/Alteration (FIELD ONLY)

Repair and alteration of boilers, pressure vessels, piping and fittings at field sites controlled by the above location only in accordance with CSA Standard B51, Boiler, Pressure Vessel and Pressure Piping Code.

N/A

QA-05699

Process Piping Installation ASME B31.3 (FIELD ONLY)

Fabrication, assembly, erection and repair of process piping at field sites controlled by the above location in accordance with CSA Standard B51, Boiler, Pressure Vessel and Pressure Piping Code and ASME B31.3 Process Piping.

N/A

QA-05839

CSA-B51 Fittings

Fabrication of Welded and Non-Welded Category A, B, C, D, E, F & H type Fittings only at the Above Location Only. In accordance with CSA Standard B51 Boiler, Pressure Vessel and Pressure Piping Code.

N/A

QA-05698

Power Piping Installation ASME B31.1 (FIELD ONLY)

Fabrication, assembly, erection and repair of power piping at field sites controlled by the above location in accordance with CSA Standard B51, Boiler, Pressure Vessel and Pressure Piping Code and ASME B31.1 Power Piping.

N/A

QA-05829

Online Leak Sealing

Online leak sealing of pressure equipment in accordance with CSA Standard B51, Boiler, Pressure Vessel and Pressure Piping Code.

N/A